HYDROPOL, LIBÉRIE

Heavy-load crane ACS 35t/8.9 m.

For a major Czech company Hydropol, we delivered and installed a double girder overhead crane carrying capacity of 35 tons a span of 8.9 meters including a crane runway length of 20.4 meters, which will be used for handling water turbine in the hall of hydroelectric power plant in Liberia. The hydropower plant will serve as a power source for rubber plantation and adjoining villages. Our installers was in quite difficult conditions, including assembled the appropriate testing. Overall the entire installation took 15 days. Both the client and the Belgian owner of the plantation were very satisfied with our supply and installation.

HYDROPOL, LIBÉRIE